A new axle assembly facility is taking shape in Stoke-on-Trent to supply Bentley’s Crewe factory. Strategic supplier ZF Foxconn Chassis Modules (ZFFCN) has started construction at Chatterley Park, about 17 miles from Bentley’s headquarters, with production scheduled to begin in 2027.

Axle systems closer to Crewe
The purpose-built site is being created exclusively to supply Bentley. It will assemble complete front and rear axle systems, bringing assembly, logistics and supply-chain work closer to the car maker’s production operations.
Once operational, the facility will deliver complete front and rear suspension modules directly to Bentley’s production lines using a just-in-sequence model. That approach ties the arrival of components to the order in which vehicles move through the factory.
Bentley says the facility will support future vehicle programmes across internal-combustion, hybrid and electric powertrains. The announcement is therefore about manufacturing capacity for a mixed product range, rather than an axle plant dedicated only to electric cars.
A step toward a local supplier park
Andreas Lehe, Bentley’s Member of the Board for Manufacturing, describes the investment as the first cornerstone of an ambition to bring key suppliers closer to Crewe through a future supplier park. It is part of Bentley’s wider UK localisation strategy and its Beyond100+ transformation.
The distinction matters: ZFFCN is the strategic supply partner constructing the Stoke-on-Trent facility. Bentley is welcoming that investment and the closer manufacturing relationship, not announcing that it has built a second car-assembly factory.
The release gives a planned production start of 2027, but does not state an investment total, a jobs figure or an annual axle capacity. Nor does it name the individual future Bentley models the facility will serve. Those details should not be assumed from the broad reference to three propulsion types.
For enthusiasts watching the next chapter at Crewe, the news is a reminder that a new car programme also depends on the less visible work of suppliers. Here, that work is moving nearer to Bentley’s home, with the first groundwork already under way.
Read more in our Bentley coverage.
Source and image: Bentley Motors, November 16, 2026, via Newspress. Image supplied for editorial use.


Be the first to comment